A lady called Caz Wells, a network co-ordinator within the Network Management team for East Sussex Highways wrote to advise and invite feedback of upcoming works on C40 Jevington Road
The major works are being carried out by SGN to install a new gas main and service pipes to the given area - Jevington through Filching to Wannock for 24 weeks from May 2022. Due to the extent of the works (approximately 2,800 metres of new gas mains pipe and 57 gas service pipes) it is proposed that the road will be closed, with no access retained during the works.
Phase 1 NSG 42702655/42702654 from Filching Close south to next NSG (approx 1000 m of main) outside property Ashleigh.
Phase 2 NSG 42702690 from above to Green Lane (approx 1160 m)
Phase 3 NSG 42702690 from above to Hunters Moon

During phase 1 & 2, access and egress will be routed via Friston only.

During phase 2, access and egress will be routed via Wannock only.

THE ROAD WILL HAVE TO BE CLOSED WHILST THE WORKS ARE BEING UNDERTAKEN.

East Sussex Highways appreciate that this will cause "some inconvenience" to residents but the current gas pipes are beyond their life expectancy and are being replaced with new pipes to ensure future gas services continue

The timing of these works is paramount as SGN wish to minimise any inconvenience caused to the local community.

We, the undersigned, call on East Sussex Highways to retain two way controlled access and egress to and from Jevington Village throughout the period of planned SGN works, for the sole purposes of; residential access, provision of social and domestic care, animal welfare and business protection during the hours of 16:00 to 09:00 daily.

GoPetition respects your privacy.

The Retain vehicle access to Jevington during 24 week SGN mains replacement works petition to East Sussex Highways was written by Helen Bainbridge and is in the category Local Government at GoPetition.